Naugatuck Valley Community College

Project Overview & Specifications

  • Project Location:
    Waterbury, CT
  • Project Architect:
    Phase I: Straus-Edwards Associates, Architects Phase II: Macchi Engineers, LLC
  • Owner:
    State of Connecticut
  • Completion Date:
    Phase I: February 8, 2002 Phase II: September 14, 2005
  • Cost Range:
    Phase I: $4,051,544 Phase II: $1,479,777
Established in 1962, Naugatuck Valley Community College is located in the bustling city of Waterbury, CT. NVCC is a two-year public college that offers numerous associates degrees, the most popular of which include General Studies, Liberal Arts and Sciences, Business Management, Human Services/Pre-Social, and Nursing. Kronenberger & Sons Restoration completed two restoration phases at NVCC. The first phase focused on repairing building leaks by replacing a failing facade and window system. The new system included architectural metal-clad panels and translucent window walls, all constructed while the building was fully occupied. The second phase was for long-term structural repairs to the Ekstrom Garages. This included hydro-demolition, power washing, partial and full-depth concrete slab repairs, concrete spall patching, concrete beam repairs, overhead concrete repairs, structural concrete replacement, epoxy crack injection, waterproof traffic membranes, line striping, drainage replacement, and electrical upgrades.
img12

Harkness Mansion Greenhouse

View more
img12

Uxbridge District Courthouse

View more
img12

Brooklyn Unitarian Church

View more
img12

The Mark Twain House

View more